Typically replies in a few hours
Terima Kasih telah menghubungi PT Pembangunan Sarana Perkasa. Ada yang bisa kami bantu?
Start Chat

Civil and Construction Works


Open cut tunneling using SM for vertical road realignment
                    
Formation of slopes from rock excavation work for open tunnels is a very important item but it is difficult to produce using other equipment. SM is capable to execute slope formation work where the process is carried out layer by layer following the rock excavation work, without using any excavator. The result is a neat slope shape according to the required design.
Design & construct of heavy duty pavement and lay down storage area (such as container yard)
                    
For design & construction work, PT PSP always uses the locally available materials to provide cost efficiency for the owner. (such as limestone in Tuban) Sampling of materials in the field, and then testing in the laboratory in order to obtain basic properties and material strength characteristics that will be used as design parameters. As for the pavement layer, cement treated base (CTB) + concrete Paving Block (CPB) high strength (50 MPa).
Pavement road and parking area using cement treated base (CTB) & Concrete Paving Block (CPB)
                    
PT PSP is very experienced in pavement work using cement treated base (CTB) + concrete Paving Block (CPB) construction since 32 years.
                  
Because this construction is the best solution in terms of:
- Speed of construction execution.
- Ability to accept heavy duty load (static & dynamic loads).
- Ease of maintenance due to heavy duty loading.

Because this construction is the best solution in terms of:
- Concrete Paving Block ( CPB ), 50 MPa strength 10 cm thick 
- Sand bedding t: 5 cm
- Cement treated base ( CTB ), UCS : 32 kg/cm2, CBR : 90%, t : 40 cm
Powered by MakeWebEasy.com
This website uses cookies for best user experience, to find out more you can go to our Privacy Policy  and  Cookies Policy